Wedding Barn Build Progress

BEFORE / AFTER photos
See the progress of our old cattle barn being demolished in 2019  &  re-built from scratch into a beautiful new Barn for wedding & events!

2014,
We purchase Brook House Farm.  The two images show  the old cattle barn and hay storage pole barn as we bought it.
(The grey building you see in the background is the Cottage before refurbishment) 

Wedding Barn Build Progress-Haybarn Wedding Venue
Wedding Barn Build Progress-Haybarn Wedding Venue

.

 

 

 

 

 

 

Wedding Barn Build Progress-Haybarn Wedding Venue

 

MAY 2018 

We make a start on the driveway with a 13 ton digger. Target is to complete a 160 meter long driveway and car park in one month!
 Our younger daughter Maisie aged 10 comes up with the name The Haybarn for our barn.

 

 

 

 

 

 

 

 

 

March 2018,
The snow is melting leaving behind a lot of surface water the digger is turning our field into a canal instead of a driveway !

Wedding Barn Build Progress-Haybarn Wedding Venue
Wedding Barn Build Progress-Haybarn Wedding Venue

MID MARCH 2018,
Two weeks into the job, more rain  = more mud!
The picture shows the top soil taken out to make the driveway is carefully placed into a large half moon shape to later plant many trees and turn this area to woodland for a future wedding ceremony.

Wedding Barn Build Progress-Haybarn Wedding Venue

.

MID MARCH 2018,
The diggers starting working on our main car park area. 

We also demolish part of one of the old pole barns which used to store hay.

 

Wedding Barn Build Progress-Haybarn Wedding Venue

                PROGRESS,
                 This area will become the main car park and front of the Barn, the old barn will be extended. 

Wedding Barn Build Progress-Haybarn Wedding Venue

Before / After,
Comparison images September 2017   &  March 2018.

Wedding Barn Build Progress-Haybarn Wedding Venue
Wedding Barn Build Progress-Haybarn Wedding Venue













Drainage,

New drainage goes into the ground under the car park to make repairs to the old broken and blocked land drain.

Wedding Barn Build Progress-Haybarn Wedding Venue
Wedding Barn Build Progress-Haybarn Wedding Venue

                  Building our main Car Park,                  

Wedding Barn Build Progress-Haybarn Wedding Venue

Late MARCH 2018,
We moved 680 tons of soil to build our car park and driveway.  The soil is re-used to make a large half moon area where we will plant 400 fast growing British Native trees and create a future natural dense woodland to form a secluded woodland Ceremony or welcome drinks area by the Brook. 

We estimate 3-4 years for the woodland to start looking green, these trees will grow 3 to 5 ft per year !    By 2019 it will already look green and lush. 

Wedding Barn Build Progress-Haybarn Wedding Venue

 

April 2018.   –    The drive & car parks are done!
In the right hand side of the picture you can see the 400 young trees planted ( mainly in the brown area of the image). 

Wedding Barn Build Progress-Haybarn Wedding Venue

                 June 2018, 
                  Our Festival Wedding seasons starts. Building work  now pauses for the summer months and the rest of the year for our weddings. 

Wedding Barn Build Progress-Haybarn Wedding Venue

January 2019,     Work resumes…                                                                                                                  March 2019,  Demolition done!  

 The barn as it is before we knock it down!                                                                                                  The image bellow shows the open space.  
The previous owners  used the barn as a lambing shed for 25 years                                                We keep the original steel structure intact.

Wedding Barn Build Progress-Haybarn Wedding Venue
Wedding Barn Build Progress-Haybarn Wedding Venue
Wedding Barn Build Progress-Haybarn Wedding Venue

May –  2019,                                                                                                                                                       June  – 2019,   Doors & Windows                                                                 

Walls are being erected.                                                                                                                                We install our By-fold doors and windows for  maximum natural daylight.
                                                                              

Wedding Barn Build Progress-Haybarn Wedding Venue
Wedding Barn Build Progress-Haybarn Wedding Venue

June – 2019,
We start cladding the exterior walls of our barn with Cedar timber boards.
Once weathered the boards will turn grey in time.  This will create a traditional timber barn look that will age and change over the years. 

Wedding Barn Build Progress-Haybarn Wedding Venue

June – 2019,
We install a safety fence along the brook, and start the landscaping by bringing in 100 tons of final surface gravel to create a lovely courtyard under 200 year old oak tree.

Wedding Barn Build Progress-Haybarn Wedding Venue

              19th June 2019,  Landscaping (phase 1)
               We are starting to see a beautiful barn coming on !   We are very excited to show our progress our couples.

Wedding Barn Build Progress-Haybarn Wedding Venue

10th July 2019,     Old roof is removed
Asbestos concrete roof sheets are taken down and taken away making way for new insulated roofing  

Wedding Barn Build Progress-Haybarn Wedding Venue
Wedding Barn Build Progress-Haybarn Wedding Venue
Wedding Barn Build Progress-Haybarn Wedding Venue

25th July 2019,   Roofing 
We install insulated steel sheet roofing to keep the industrial / agricultural barn look we want to achieve.
Skylights will provide lots of natural light in the building.

Wedding Barn Build Progress-Haybarn Wedding Venue
Wedding Barn Build Progress-Haybarn Wedding Venue


Sept 2019,     Concrete Floor

We apply thick 4″ insulation material to the floor in preparation for our concrete poor.

Concrete floor poor  over the insulation sheets.
 We now must wait 3 months for the concrete to fully harden and cure before we can tile the floor.

Wedding Barn Build Progress-Haybarn Wedding Venue
Wedding Barn Build Progress-Haybarn Wedding Venue

10th Sept 2019,     Interior walls
We receive 500 lengths of freshly cut scaffold timber boards from Scandinavia. 
We mix &  blend over a dozen different types of home made natural wood dies using coffee, tea, charcoal, vinegar, beetroot and a few secret recipes !
This will create a random, distressed warm look.

We will need 30-40 days  to stain 500 boards by hand !  

Wedding Barn Build Progress-Haybarn Wedding Venue
Wedding Barn Build Progress-Haybarn Wedding Venue
Wedding Barn Build Progress-Haybarn Wedding Venue

10th December 2019,       Walls are done !
Following a few set backs, builders holidays, longer lead times for our electrician,  3 months for concrete floor to fully cure and other unenforced issues, we have finally done it!     (still need to tile the floor)

Wedding Barn Build Progress-Haybarn Wedding Venue
Wedding Barn Build Progress-Haybarn Wedding Venue

 

 The BARN is now FINISHED !!

 

Barn Weddings Shrewsbury
Wedding Barn Build Progress-Haybarn Wedding Venue
Wedding Barn Build Progress-Haybarn Wedding Venue
Wedding Barn Build Progress-Haybarn Wedding Venue